Quick answer: The PSPCL VDS Scheme 2026 (Voluntary Disclosure Scheme) lets farmers in Punjab regularise unauthorised extra load on their agricultural tubewell (AP) connection at reduced charges: ₹2,500 per BHP service connection charges instead of ₹6,572, and ₹200 per BHP security instead of ₹400, with no penalty or load surcharge. The scheme started on 1 October 2026 and has now been extended till 29 December 2026.
| Scheme | Voluntary Disclosure Scheme (VDS) for Agriculture Tubewell (AP) consumers |
| Official circulars | PSPCL Commercial Circular No. 37/2026 (30-09-2026); extension memo No. 233-239/VDS/AP/Vol-VII (13-11-2026) |
| Who can apply | AP (agricultural tubewell) consumers existing on 29 May 2026 who are running more load than sanctioned |
| Service connection charges | ₹2,500 per BHP (normally ₹6,572 per BHP) |
| Security (consumption) | ₹200 per BHP (normally ₹400 per BHP) |
| Penalty / load surcharge | None while the scheme is open |
| Charges apply on | The additional load only |
| Original period | 1 October 2026, for 45 days |
| Extended last date | 29 December 2026 |
| How | Self-declaration on the prescribed form (Annexure-I) plus deposit of charges with PSPCL |
Table of Contents
- What Is the PSPCL VDS Scheme for Tubewells?
- Last Date: VDS Extended Till 29 December 2026
- Who Is Eligible?
- VDS Charges: Old vs New
- Worked Example: How Much Will You Pay?
- How to Apply for PSPCL VDS (Step by Step)
- Documents Required
- Transformer and Line Augmentation
- What Happens After 29 December 2026?
- ਪੰਜਾਬੀ ਵਿੱਚ ਸੰਖੇਪ (Punjabi Summary)
- Frequently Asked Questions
- Official Circulars and Sources
What Is the PSPCL VDS Scheme for Tubewells?
Many farmers run a bigger motor on their tubewell than the load (horsepower) sanctioned on their PSPCL connection. For example, a connection may be sanctioned for 10 BHP while a 15 BHP motor is installed. This extra load is called unauthorised extension in load. If PSPCL checking teams detect it, it can normally attract penalty and load surcharge under the Supply Code.
The VDS gives AP consumers a window to declare this extra load themselves and get it regularised at lower charges, without penalty. PSPCL introduced it through Commercial Circular No. 37/2026 dated 30 September 2026, following the Punjab State Electricity Regulatory Commission (PSERC) order dated 29 May 2026 on Petition No. 33 of 2026.
Last Date: VDS Extended Till 29 December 2026
| Event | Date |
|---|---|
| PSERC order (basis of the scheme) | 29 May 2026 (Petition No. 33 of 2026) |
| Circular CC 37/2026 issued | 30 September 2026 |
| Scheme starts | 1 October 2026 (for 45 days) |
| Original closing | 14 November 2026, as stated by the Power Minister |
| Extension memo issued | 13 November 2026, with PSERC approval |
| New last date | 29 December 2026 (extended by another 45 days) |
The extension memo (No. 233-239/VDS/AP/Vol-VII, dated 13-11-2026, in Punjabi) says that, with the approval of the Punjab State Electricity Regulatory Commission, the scheme has been extended for the next 45 days, up to 29-12-2026, so that more consumers can benefit. It also says all other instructions of CC 37/2026 remain the same.
Who Is Eligible?
- You must be an Agriculture Tubewell (AP) consumer of PSPCL (clause i).
- Your connection must have been existing on 29 May 2026 (clause i).
- You are running more load than your sanctioned horsepower, or want to regularise a higher-capacity motor (clause ii and the scheme subject).
- A representative (for example, the person actually cultivating the land when the connection is in someone else’s name) can also apply, with an extra undertaking (clause iv, Annexure-II).
The scheme is only for agricultural tubewell connections. It does not cover domestic, commercial or industrial connections. Domestic consumers with old unpaid bills may want to check our guide to the PSPCL OTS Scheme 2026, which is a separate scheme.
VDS Charges: Old vs New
| Charge | Normal rate | Under VDS 2026 |
|---|---|---|
| Service Connection Charges | ₹6,572 per BHP | ₹2,500 per BHP |
| Security (consumption) | ₹400 per BHP | ₹200 per BHP |
| Penalty / load surcharge on unauthorised load | Can apply if detected | None during the scheme |
| Augmentation of line/cable/transformer, if needed | n/a | Done by PSPCL at its own cost |
These charges are payable on the additional load only, i.e. the extra BHP you are regularising, not your full load (clause ii). The “no penalty / load surcharge” benefit applies both when you declare the load yourself and when PSPCL checking agencies detect it, as long as the scheme is open (clause iii).
Note: Some reports on 14 November 2026 described the reduced charges as part of the extension. In fact, CC 37/2026 has had these reduced rates since the scheme began on 1 October 2026. The extension keeps them in place till 29 December.
Worked Example: How Much Will You Pay?
Illustrative calculation using the per-BHP rates in CC 37/2026. Your sub-division will confirm the exact amount.
Example 1: Sanctioned 10 BHP, motor of 15 BHP (5 BHP extra)
| Item | At normal rates | Under VDS 2026 |
|---|---|---|
| Service connection charges | 5 × ₹6,572 = ₹32,860 | 5 × ₹2,500 = ₹12,500 |
| Security (consumption) | 5 × ₹400 = ₹2,000 | 5 × ₹200 = ₹1,000 |
| Total | ₹34,860 (plus any penalty/load surcharge if detected) | ₹13,500, no penalty |
Saving: ₹21,360, before even counting the penalty or load surcharge you could face if the extra load were caught outside the scheme.
Example 2: Sanctioned 15 BHP, motor of 25 BHP (10 BHP extra)
| Item | At normal rates | Under VDS 2026 |
|---|---|---|
| Service connection charges | 10 × ₹6,572 = ₹65,720 | 10 × ₹2,500 = ₹25,000 |
| Security (consumption) | 10 × ₹400 = ₹4,000 | 10 × ₹200 = ₹2,000 |
| Total | ₹69,720 | ₹27,000 |
How to Apply for PSPCL VDS (Step by Step)
- Check your sanctioned load. Find the sanctioned horsepower and account number on your AP connection bill or records, and note the actual BHP of the motor you run.
- Get the VDS form (Annexure-I). It is attached to CC 37/2026 (official PDF) and is filled in duplicate. You can also ask at your PSPCL sub-division office.
- Fill in the details: sub-division name, date, consumer/representative name, father’s name, mobile number, Aadhaar number, e-mail, account number, address where the connection runs, sanctioned load (HP), total declared HP, additional declared HP, whether the transformer is individual or joint, and the transformer’s name, capacity and location if known.
- Sign the undertaking on the form that you will install a shunt capacitor matching the capacity of the motor.
- If a representative is applying, also give the Annexure-II undertaking (details below). In that case, details at Sr. No. 3 and 4 (name and father’s name) are needed for both the consumer and the representative.
- Submit the form and deposit the charges (service connection charges + security for the additional BHP). The office records the amount and gives a payment receipt number and date. Keep your copy.
- Verification: PSPCL officials (LM/AJE/JE/AAE) fill in the technical part, including whether the line or transformer needs augmentation.
Under clause iv, the unauthorised load is deemed to be regularised once you submit the self-declaration on the prescribed form along with the necessary charges. During the scheme, field officers and enforcement teams will also visit AP consumers to check connected load and help with correct assessment. PSPCL has been asked to hold consumer contact camps in rural areas.
Alternative: instead of regularising, you may remove the unauthorised load and inform PSPCL (clause iii).
Documents Required
- Annexure-I form (in duplicate), signed
- Photocopy of your Aadhaar card (the form asks you to attach it)
- AP connection account number and sanctioned load details
- Mobile number (and e-mail, if any)
- For a representative: the Annexure-II undertaking, signed by the deponent, with a witness
- Payment for service connection charges and security on the additional BHP
What the Annexure-II undertaking says
The representative declares that they are the actual user and cultivator of the land where the AP tubewell connection is installed, and that it was not possible to get the consent needed by PSPCL for the load extension. They agree to keep PSPCL harmless against claims by the actual consumer or landowner, and not to claim any refund or legal right on the connection. After the load extension, the connection continues in the name of the bonafide consumer.
Transformer and Line Augmentation
If your extra load needs a bigger transformer, cable or service line, PSPCL will carry out the augmentation at its own cost (clause vi). Augmentation cases are handled on a first-come, first-served basis, with separate seniority for cases that need transformer and service line augmentation (clause vii). So applying early can help.
What Happens After 29 December 2026?
The no-penalty, reduced-charge benefit applies only “during the period VDS remains operative” (clause iii). After the scheme closes, regularisation and load extension follow the normal terms of the PSERC Supply Code-2024, which the circular says must still be followed for everything else. Unauthorised extra load detected after the scheme ends can be treated under the normal rules, including penalty or load surcharge. The circular does not give those amounts, so check with your sub-division.
ਪੰਜਾਬੀ ਵਿੱਚ ਸੰਖੇਪ (Punjabi Summary)
ਪੀ.ਐਸ.ਪੀ.ਸੀ.ਐਲ. ਦੀ ਸਵੈ-ਘੋਸ਼ਣਾ ਸਕੀਮ (ਵੀ.ਡੀ.ਐਸ.) ਤਹਿਤ ਖੇਤੀਬਾੜੀ ਟਿਊਬਵੈੱਲ ਖਪਤਕਾਰ ਆਪਣੀ ਮੋਟਰ ਦਾ ਵਾਧੂ (ਅਣ-ਅਧਿਕਾਰਤ) ਲੋਡ ਘੱਟ ਖਰਚੇ ’ਤੇ ਨਿਯਮਤ ਕਰਵਾ ਸਕਦੇ ਹਨ: ਸਰਵਿਸ ਕੁਨੈਕਸ਼ਨ ਚਾਰਜ ₹2,500 ਪ੍ਰਤੀ ਬੀ.ਐਚ.ਪੀ. (₹6,572 ਦੀ ਥਾਂ) ਅਤੇ ਸਕਿਓਰਿਟੀ ₹200 ਪ੍ਰਤੀ ਬੀ.ਐਚ.ਪੀ. (₹400 ਦੀ ਥਾਂ), ਕੋਈ ਜੁਰਮਾਨਾ ਜਾਂ ਲੋਡ ਸਰਚਾਰਜ ਨਹੀਂ। ਇਹ ਸਕੀਮ ਹੁਣ 29 ਦਸੰਬਰ 2026 ਤੱਕ ਵਧਾ ਦਿੱਤੀ ਗਈ ਹੈ। ਫਾਰਮ (ਅਨੁਲੱਗ-I) ਭਰ ਕੇ ਆਪਣੇ ਪੀ.ਐਸ.ਪੀ.ਸੀ.ਐਲ. ਉਪ ਮੰਡਲ ਦਫ਼ਤਰ ਵਿੱਚ ਚਾਰਜ ਜਮ੍ਹਾਂ ਕਰਵਾਓ।
हिंदी में: पंजाब में ट्यूबवेल मोटर का अतिरिक्त लोड अब ₹2,500 प्रति BHP और ₹200 प्रति BHP सिक्योरिटी देकर बिना जुर्माने के नियमित करवाया जा सकता है। अंतिम तिथि 29 दिसंबर 2026 है।
Frequently Asked Questions
What is the PSPCL VDS Scheme 2026?
It is a Voluntary Disclosure Scheme for agricultural tubewell (AP) consumers to regularise unauthorised extra load at reduced charges and without penalty. It was introduced through PSPCL Commercial Circular No. 37/2026 dated 30 September 2026.
What is the last date of the VDS scheme?
29 December 2026. The scheme started on 1 October 2026 for 45 days and was extended by another 45 days, up to 29-12-2026, by PSPCL memo dated 13-11-2026 with PSERC approval.
What are the VDS charges per BHP?
Service connection charges of ₹2,500 per BHP instead of ₹6,572, and security (consumption) of ₹200 per BHP instead of ₹400, on the additional load only.
Is there any penalty under VDS?
No. No penalty or load surcharge is charged on unauthorised load, whether self-declared or detected by checking agencies, while the scheme is open (clause iii of CC 37/2026).
Who is eligible for the tubewell VDS?
Agriculture Tubewell (AP) consumers whose connections existed on 29 May 2026 and who have unauthorised extra load to regularise.
Do I pay charges on my full load or only the extra load?
Only on the additional load being regularised (clause ii).
How do I apply for VDS?
Fill the prescribed Annexure-I form in duplicate, attach a photocopy of your Aadhaar, and submit it with the charges for the additional BHP to PSPCL. The load is deemed regularised on self-declaration with the necessary charges (clause iv).
What documents are required?
The Annexure-I form, an Aadhaar photocopy, account number and sanctioned load details, mobile number, the payment for the extra BHP, and the Annexure-II undertaking if a representative applies.
Can someone other than the registered consumer apply?
Yes. A consumer representative, such as the person actually cultivating the land, can apply by also submitting the Annexure-II undertaking. The connection stays in the name of the bonafide consumer.
Who pays if my transformer or line needs upgrading?
PSPCL will carry out augmentation of the service line, cable, transformer and power system at its own cost. Such cases are handled first-come, first-served (clauses vi and vii).
Do I need to install a capacitor?
Yes. The form includes an undertaking that you will install a shunt capacitor matching the capacity of your motor.
What if I don’t want to regularise the extra load?
You can remove the unauthorised load and inform PSPCL (clause iii).
What happens after 29 December 2026?
The reduced charges and no-penalty benefit apply only while the scheme is open. After that, the normal Supply Code-2024 rules apply, which can include penalty or load surcharge on unauthorised load.
Were the charges reduced only in the November extension?
No. The reduced rates of ₹2,500 and ₹200 per BHP have been part of CC 37/2026 since 1 October 2026. The extension only gives more time.
Official Circulars and Sources
- PSPCL Commercial Circular No. 37/2026 (30-09-2026): VDS for Agriculture Tubewell (AP) Consumers, with Annexure-I form and Annexure-II undertaking
- PSPCL memo No. 233-239/VDS/AP/Vol-VII (13-11-2026): extension of VDS till 29-12-2026 (Punjabi)
- PTI: Punjab VDS for regularisation of excess load on agricultural tubewell extended (14 Nov 2026)
- Punjab Newsline: Power Minister Tarunpreet Singh Sond on the extension
- Babushahi: Punjab extends tubewell load regularisation scheme till Dec 29
PRPunjab.in is not affiliated with PSPCL or the Government of Punjab. Confirm your load and the amount payable at your PSPCL sub-division office. Last updated: 15 November 2026.